50Hertz has installed two offshore substations for the 976MW Gennaker offshore wind farm in the Baltic Sea.
Source: Power Technology, 2026-10-19. Third-party report, linked to its original publisher; IC360 has not independently verified it.
50Hertz has installed two offshore substations for the 976MW Gennaker offshore wind farm in the Baltic Sea.
Source: Power Technology, 2026-10-19. Third-party report, linked to its original publisher; IC360 has not independently verified it.